"How long will it take?" is one of the first questions every homeowner
asks before a painting project. The honest answer is: it depends โ but
there are reliable ranges you can plan around. As a guide, a
professional crew can paint the
interior of an average 3โ4 bedroom home in 5โ10 days, and the
exterior in 5โ12 days, depending on size, condition and weather. Here's the full breakdown.
Typical Painting Timelines
Interior Painting
-
Single room:
1โ2 days
-
3-bedroom house:
4โ7 days
-
4โ5 bedroom house:
7โ12 days
-
Whole house + ceilings/trim:
10โ15 days
Exterior Painting
-
Weatherboard (single storey):
4โ7 days
-
Rendered home:
5โ8 days
-
Double storey:
7โ12 days
-
With major prep/repairs:
add 2โ5 days
Quick rule of thumb: Most professional painting crews
can complete 1โ2 average rooms per day when walls are in good
condition. Larger homes, high ceilings and extensive preparation all
extend the timeline.
What Affects How Long Your Paint Job Takes
1. Size & Number of Rooms
The more surface area to cover, the longer it takes. Ceilings,
hallways, stairwells and high rooms add significant time.
2. Surface Condition & Prep Work
Preparation is 70% of a quality job. Cracks, holes, peeling paint,
sanding and priming all take time โ but skipping prep is why cheap
jobs fail.
3. Weather & Season
Exterior painting needs dry, mild conditions. Melbourne and
Geelong's changeable weather can add delays. Spring, summer and
early autumn are ideal.
4. Number of Coats & Colours
Most projects need two coats plus primer. Dramatic colour changes
or dark-to-light transitions may require an extra coat.
5. Crew Size & Access
A larger, experienced crew works faster. Difficult access (steep
roofs, tight spaces, double storey) slows things down and requires
more equipment.