Quality Painting Group
Welcome back. Here's exactly where your project stands right now โ updated as we go.
Project Address
House 2, 320 Great Ocean Road, Bellbrae
Quote Number
QBCG29023
Quote Date
05 Sep 2026
Approved
23 Sep 2026
Live Status
Your project moves through these stages in order. Completed stages are ticked off as we finish them.
Quote QBCG29023 was issued on 05 Sep 2026 and approved on 23 Sep 2026 for your project at Bellbrae.
Quote issued 05 Sep 2026 ยท Approved 23 Sep 2026
We attended the property to assess the scope and photograph its existing condition before any work begins.
Attended 03 Sep 2026 at 9:30am
Your start date is being held for you. It becomes fully confirmed once your 10% deposit is received. In the meantime we're ordering and preparing materials so everything is ready to go on day one.
Material order in progress
Confirmation subject to deposit payment
Your 10% deposit is still outstanding. Once it's received we'll lock in your start date and confirm your booking.
Awaiting payment
Surfaces cleaned, sanded and repaired, with floors and furniture fully masked and protected.
Expected from 10 Jan 2027
Undercoat seals the surface so your top coats bond properly and last longer.
Two full coats of your chosen colour, applied in order to build an even, durable finish.
Cutting in edges, trim work, and a final walkthrough to catch anything that needs attention.
Site cleaned, protection removed, and we complete your handover inspection together.
Estimated start 10 Jan 2027. Dates can shift with weather and material availability. If anything changes, we'll update this page and let you know directly.
Site Visit
These photos were taken during our site visit on 03 Sep 2026 at 9:30am. They record the condition of the property before any work begins.
Why we record this: Documenting the property's condition before we start protects you as much as us. Any marks, cracks or existing damage shown here are pre-existing and were noted before work commenced.
Sunroom / conservatory exterior
Pre-existing condition
Glass door & window frames, red brick wall
Pre-existing condition
Living room โ cream walls, hardwood floor
Pre-existing condition
Bedroom โ beige walls, ceiling fan, curtains
Pre-existing condition
Living room โ white brick fireplace & mantel
Pre-existing condition
Existing wall markings on drywall
Pre-existing condition
Kitchen โ refrigerator unit in situ
Pre-existing condition
Ceiling โ skylight, vents & outlet
Pre-existing condition
Bathroom โ white brick walls
Pre-existing condition
Ceiling โ recessed light & smoke detector
Pre-existing condition
These images form part of your project record and will remain on this page until the job is complete.
Next Steps
Nothing is needed from you right now. Here's what we're doing behind the scenes.
We're locking in your paint, primers and sundries now, so there are no hold-ups once we're on site.
Your team is booked for the 10 Jan 2026 start and briefed on your project scope and colour schedule.
Expect a call or message a few days out to confirm access, parking and start time.
Once work starts, we'll add progress photos to this page at each stage so you can follow along.
Your Documents
Your accepted quote and project paperwork, all in one place.
Issued 05 Sep 2026 ยท Approved 23 Sep 2026
10% of quoted total ยท Payment still pending
To be linked from your file share
Added at project completion
Send us your Google Drive links and we'll connect them here.
We're happy to talk through anything you see here. Give us a call or send a message and we'll get straight back to you.
Quote QBCG29023 ยท Quality Painting Group ยท Geelong, Melbourne & surrounding areas