Exterior Repaint โ€” Newtown

Welcome back. Here's exactly where your project stands right now โ€” updated as we go.

Project Location

Skene St, Newtown VIC 3220

Estimate Number

QBCG29028

Quoted

15 Sep 2026

Approved

21 Sep 2026

Exterior painting Mixed cladding โ€” weatherboard, brick & render Colours matched to existing
Overall Progress 25%
Currently: Scaffold delivered โ€” painting starts Thursday 19 Nov Start date now 19 November 2026

Scaffold is up โ€” the scaffold has been delivered and set up, and materials are on site. Our crew are now due to start on Thursday 19 November 2026 (brought forward from the original 20 Nov date). We'll confirm the morning of arrival as we get closer.

Live Status

Where We Are Up To

Your project moves through these stages in order. Completed stages are ticked off as we finish them.

Estimate Issued & Approved

Complete

Estimate QBCG29028 was issued on 15 Sep 2026 and approved on 21 Sep 2026 for the exterior repaint at Skene St, Newtown.

Quoted 15 Sep 2026 ยท Approved 21 Sep 2026

Site Inspection by Joda

Complete

Joda attended the property to assess the scope and photograph its existing condition before any work begins.

Inspected by Joda ยท Survey photos below

Materials Ordered

Complete

Exterior paint, primers, sealers and sundries were ordered and delivered on site Monday 16 November 2026 โ€” ahead of the start date so there are no hold-ups.

Delivered Monday 16 Nov 2026 ยท materials on site

Booked for Newtown

Complete

Your booking is confirmed and the crew are due on site Thursday 19 November 2026 โ€” brought forward from the original 20 Nov date now that the scaffold is already up.

Possible start 19 Nov 2026 ยท Scaffold delivered 16 Nov

Deposit Received

Complete

Your deposit has been received - thank you. Your booking is now confirmed and your start date is locked in.

Received 7 October 2026

Colour Matching to Existing

Scheduled

We'll match your existing colours and prepare draw-down samples so you can approve the finish before we proceed across all surfaces.

Scaffold & Material Delivery

Complete

The scaffold has been delivered and set up, and your materials arrived on site on Monday 16 November 2026. Everything is in place for the crew to start.

Scaffold delivered & erected ยท Mon 16 Nov 2026

Paint, primers, sealers & sundries on site

Next Up

Surface Preparation & Wash

From 19 Nov

All three surfaces prepared individually โ€” weatherboards washed and sanded, brick and render cleaned and patched as needed. Starting Thursday 19 November 2026 now the scaffold is up.

Scaffold delivered โ€” crew ready to start

Primer, Sealer & Top Coats

Upcoming

Surface-appropriate primers and sealers, followed by two full top coats in your matched colour across each cladding type.

Detail & Touch-ups

Upcoming

Cutting in around trim, eaves, window frames and junctions between cladding types, plus a final walkthrough.

Scaffold Removal, Clean & Sign-off

Upcoming

Scaffold removed, site cleaned, protection taken down, and we complete your handover inspection together.

Scaffold delivered Monday 16 Nov 2026 ยท start Thursday 19 Nov 2026. Scaffold and materials are on site, so the crew can now start a day earlier than originally planned. Dates can still shift with weather and material supply. Exterior work is particularly weather-dependent โ€” if anything changes, we'll update this page and let you know directly.

Site Inspection

Pre-Existing Condition Record

These photos were taken during our site inspection by Joda. They record the condition of the property before any work begins.

Inspected by Joda 10 photos recorded

Why we record this: Documenting the property's condition before we start protects you as much as us. Any marks, cracks, failed coatings or existing damage shown here are pre-existing and were noted before work commenced.

Modern two-story home with large windows, tan exterior, and dark trim against clear blue sky

Full exterior โ€” upper level & trim

Pre-existing condition

Weathered wooden door and windows showing bare tree branches through glass against blue sky

Timber door & frames โ€” weathered coating

Pre-existing condition

Front of house with cream-colored siding, double red-trimmed windows, and two decorative planters on either side of brick entrance

Front facade โ€” siding & brick entrance

Pre-existing condition

Beige residential house exterior with covered porch, open soffit, and clear blue sky overhead.

Porch, soffit & eaves

Pre-existing condition

Covered porch with paneled ceiling, ornate burgundy door, and black metal screen door leading to a sunny front entrance

Entry door & porch ceiling detail

Pre-existing condition

Sunny residential patio with paved flooring, cream-colored walls, black-framed glass doors and windows, and a wall lamp

Entertaining area โ€” rendered wall & frames

Pre-existing condition

Modern house exterior with cream-colored walls, dark-framed pergola overhang, and clear blue sky above

Pergola overhang & fascia line

Pre-existing condition

Burgundy pergola with white sheer curtains overlooking green hedge and potted plants below

Painted pergola structure

Pre-existing condition

Modern home roof with cream siding, burgundy trim, and support struts against clear blue sky and bare tree branches

Upper roof line & support struts

Pre-existing condition

Small modern backyard shed with cream siding, dark door and window, concrete porch, and manicured lawn on sunny day

Rear shed โ€” included in scope

Pre-existing condition

These images form part of your project record and will remain on this page until the job is complete.

Next Steps

What Happens From Here

Your deposit is in, the scaffold is up and your materials are on site. Your crew are now due to start on Thursday 19 November โ€” here's what happens next.

Deposit Received โ€” Start Date Locked In

Thanks โ€” your deposit is in, the scaffold is delivered and your materials are on site. That means the crew can now start Thursday 19 November 2026, a day earlier than originally planned.

Colour Matching

We'll match your existing colours and prepare draw-down samples so you can confirm the finish before we proceed.

Scaffold & Materials Delivered

The scaffold is up and paint, primers, sealers and sundries were all delivered on site on Monday 16 November 2026.

Next Up

Crew Start โ€” Thursday 19 Nov

With the scaffold already up, our crew are due to start on Thursday 19 November 2026 โ€” a day earlier than originally planned. Surface prep and the roof wash come first.

We'll Confirm Your Start Time

Expect a call or message before we start to confirm the arrival time and talk through parking, access and anything we need moved.

Progress Photos Begin

Your pre-existing photos are already on this page. Once work starts, we'll add progress shots at each stage.

Your Documents

Estimate & Paperwork

Your accepted estimate and project paperwork, all in one place.

Estimate QBCG29028

Issued 15 Sep 2026 ยท Approved 21 Sep 2026

Approved

Deposit Invoice

Deposit received 7 October 2026 ยท Thank you

Received

Colour Match Schedule

Matched to existing โ€” samples to be approved

In Progress

Site Inspection Record โ€” Joda

Condition photos available on this page

Complete

Scope of Works โ€” Weatherboard, Brick & Render

To be linked from your file share

Pending

Handover Checklist

Added at project completion

Upcoming

Send us your Google Drive links and we'll connect them here.

Questions About Your Project?

We're happy to talk through anything you see here โ€” your colour match, the scaffold schedule, or the photos Joda took. Give us a call or send a message and we'll get straight back to you.

Estimate QBCG29028 ยท Quality Painting Group ยท Geelong, Melbourne & surrounding areas