Quality Painting Group
Welcome back. Here's exactly where your project stands right now โ updated as we go.
Project Location
Rippleside VIC 3215
Estimate Number
QBCG29032
Quoted
20 Sep 2026
Approved
25 Sep 2026
Weatherboards โ Southerly
Trim, fascia, frames & posts โ Monument
Live Status
Your project moves through these stages in order. Completed stages are ticked off as we finish them.
Estimate QBCG29032 was issued on 20 Sep 2026 and approved on 25 Sep 2026 for the exterior repaint at Rippleside.
Quoted 20 Sep 2026 ยท Approved 25 Sep 2026
Exterior paint, primers, sealers and sundries were ordered so there are no hold-ups once we're on site.
Ordered 26 Sep 2026
Your start date of 02 Nov 2026 was confirmed and the crew attended on schedule.
Started 02 Nov 2026
Your deposit has been received - thank you. Your booking is now confirmed and your start date is locked in.
Received 1 October 2026
Your exterior colours are locked in โ Southerly on the weatherboards and Monument on the trim, fascia, frames and posts. Materials have been adjusted to match.
Colorbond Southerly
Weatherboards
Colorbond Monument
Trim, fascia, frames & posts
Confirmed 19 October 2026
The full house was washed down and all surfaces prepared, including a dedicated wash of the roof and gutters. Windows, doors and fittings were masked and protected throughout.
Washed & prepped โ week commencing 02 Nov 2026
The garage roof and garage door were both painted and coated to match the rest of the exterior.
Garage roof & door โ coated
The side wall was repaired with new studs added and new weatherboards installed, complete with fire-rated insulation behind the new section.
Coating has been applied to the sections completed so far, including the repaired side wall and the garage roof and door, in your confirmed colours โ Southerly on the weatherboards and Monument on the trim, fascia, frames and posts.
Coating underway 02โ06 Nov 2026
We're sending out some more weatherboards to finish the remaining areas, matching the profile and finish already installed.
Once the new boards are in, we'll seal and fill the joints, and close up any more gaps โ so the surface is sound and ready for coating.
Final cutting in around trim and eaves, checking the new wall section and the garage, plus a walkthrough to catch anything that needs attention.
Site cleaned, all protection removed, and we complete your handover inspection together.
Repairs, prep and first coating stage completed 02โ06 Nov 2026. The remaining areas still to be coated will be scheduled in, and we'll let you know the dates as soon as they're confirmed. Handover follows once everything is finished.
Next Steps
Here's what was done on site between 02 and 06 November, and what happens next.
The exterior was washed down, sanded and prepped, including a full wash of the roof and gutters, so every coating has a clean surface to bond to.
The side wall was repaired with new studs and new weatherboards, insulated with fire-rated insulation behind the new section.
Coating has been applied to the sections completed so far, including the repaired side wall and the garage roof and door. The remaining areas will be scheduled in โ your colours are shown below.
Colorbond Southerly
Weatherboards
Colorbond Monument
Trim, fascia, frames & posts
Confirmed 19 October 2026
We're sending out some more weatherboards to finish the remaining areas, matched to what's already installed.
Next we'll seal and fill the joints and close up any more gaps, so the surface is sound and ready for coating.
Once the new boards and prep are done, we'll finish the cutting in and touch-ups, and walk the site with you.
Once touch-ups are done we'll call to arrange a walkthrough so you can check the finish with us in person.
We'll upload progress photos to this page as the remaining areas are completed, so you have a record of the work.
Your Documents
Your accepted estimate and project paperwork, all in one place.
Issued 20 Sep 2026 ยท Approved 25 Sep 2026
Deposit received 1 October 2026 ยท Thank you
Weatherboards + trim, fascia, frames & posts
Colorbond Southerly
Weatherboards
Colorbond Monument
Trim, fascia, frames & posts
Confirmed 19 October 2026
To be linked from your file share
Added at project completion
Send us your Google Drive links and we'll connect them here.
Progress Photos
Roof washed, garage door painted, new wall studs added and insulated, weatherboards installed, and coating underway on the completed sections.
Progress photos from the 02โ06 November 2026 site attendance. More will be added as the remaining works are completed.
Site Photos
Reference photos of the surfaces included in your scope. Completed photos of the finished exterior will be added here at handover.
Photos are reference only. Progress updates will be added here during the project.
We're happy to talk through anything you see here โ especially your colour selections. Give us a call or send a message and we'll get straight back to you.
Estimate QBCG29032 ยท Quality Painting Group ยท Geelong, Melbourne & surrounding areas