Quality Painting Group
Welcome back. Here's exactly where your project stands right now โ updated as we go.
Project Location
Rippleside VIC 3215
Estimate Number
QBCG29032
Quoted
20 Sep 2026
Approved
25 Sep 2026
Weatherboards โ Southerly
Trim, fascia, frames & posts โ Monument
On site 09โ13 Nov 2026 โ weatherboards, sealing & gap prep, with detail and touch-ups now finished
Live Status
Your project moves through these stages in order. Completed stages are ticked off as we finish them.
Estimate QBCG29032 was issued on 20 Sep 2026 and approved on 25 Sep 2026 for the exterior repaint at Rippleside.
Quoted 20 Sep 2026 ยท Approved 25 Sep 2026
Exterior paint, primers, sealers and sundries were ordered so there are no hold-ups once we're on site.
Ordered 26 Sep 2026
Your start date of 02 Nov 2026 was confirmed and the crew attended on schedule.
Started 02 Nov 2026
Your deposit has been received - thank you. Your booking is now confirmed and your start date is locked in.
Received 1 October 2026
Your exterior colours are locked in โ Southerly on the weatherboards and Monument on the trim, fascia, frames and posts. Materials have been adjusted to match.
Colorbond Southerly
Weatherboards
Colorbond Monument
Trim, fascia, frames & posts
Confirmed 19 October 2026
The full house was washed down and all surfaces prepared, including a dedicated wash of the roof and gutters. Windows, doors and fittings were masked and protected throughout.
Washed & prepped โ week commencing 02 Nov 2026
The garage roof and garage door were both painted and coated to match the rest of the exterior.
Garage roof & door โ coated
The side wall was repaired with new studs added and new weatherboards installed, complete with fire-rated insulation behind the new section.
Coating has been applied across the exterior, including the repaired side wall and the garage roof and door, in your confirmed colours โ Southerly on the weatherboards and Monument on the trim, fascia, frames and posts.
Coating complete โ 02โ13 Nov 2026
The remaining weatherboards were installed and the wall sections finished off, matching the profile and finish already on the house.
All weatherboards installed โ 09โ13 Nov 2026
Joints and boards were sealed and filled, and the remaining gaps closed up โ so every surface is sound and ready for the finish coats.
Completed 09โ13 Nov 2026
Final cutting in around trim and eaves is finished, the new wall section and garage have been checked and touched up, and the last walkthrough is done. All painting work is now complete.
Completed โ all painting work finished
The only thing left. Site cleaned, all protection removed, and we complete your handover inspection together.
To be booked with you โ we'll call to arrange a time
Thank you โ we've received your latest payment against invoice QPG170751 (issued 06 Nov 2026). Receipts are shown below.
Tap or click any receipt to view it full size.
Remaining balance on QPG170751: $6,330.00. We'll confirm this with you at handover.
All painting work complete โ detail and touch-ups finished. Weatherboards, sealing, filling and gap preparation were completed on site 09โ13 Nov 2026, and the finishing work is now done. Only handover remains โ we'll be in touch to book a time that suits you.
Next Steps
All painting work is now finished โ here's what's been done, and the one thing left to do.
The exterior was washed down, sanded and prepped, including a full wash of the roof and gutters, so every coating has a clean surface to bond to.
The side wall was repaired with new studs and new weatherboards, insulated with fire-rated insulation behind the new section.
Coating has been applied across the house, including the repaired side wall and the garage roof and door, in your confirmed colours shown below.
Colorbond Southerly
Weatherboards
Colorbond Monument
Trim, fascia, frames & posts
Confirmed 19 October 2026
The remaining weatherboards are now installed across the house, matched to the profile and finish already in place.
Joints and boards have been sealed and filled, and the remaining gaps closed up, ready for the finish coats.
Final cutting in around trim and eaves is done, and the last walkthrough is complete. All painting work is now finished.
The only step left. We'll be in touch to arrange a walkthrough so you can check the finish in person and we can sign the job off together.
Current progress photos are already on this page. We'll add the finished shots once handover is done.
Your Documents
Your accepted estimate and project paperwork, all in one place.
Issued 20 Sep 2026 ยท Approved 25 Sep 2026
Deposit received 1 October 2026 ยท Thank you
Issued 06 Nov 2026 ยท Payments received ยท Balance $6,330.00
Weatherboards + trim, fascia, frames & posts
Colorbond Southerly
Weatherboards
Colorbond Monument
Trim, fascia, frames & posts
Confirmed 19 October 2026
To be linked from your file share
Added at project completion
Send us your Google Drive links and we'll connect them here.
Latest Progress Photos
Remaining weatherboards finished, sealing and gap preparation completed, and detail and touch-ups now finished across the house.
Progress photos from 09โ13 November 2026. Final photos will be added at handover.
Progress Photos
Roof washed, garage door painted, new wall studs added and insulated, weatherboards installed, and coating underway on the completed sections.
Progress photos from the 02โ06 November 2026 site attendance.
Site Photos
Reference photos of the surfaces included in your scope. Completed photos of the finished exterior will be added here at handover.
Photos are reference only. Progress updates will be added here during the project.
We're happy to talk through anything you see here โ especially your colour selections. Give us a call or send a message and we'll get straight back to you.